INSTALLATION OVERVIEW
SSL continue to work & innovate in gyms with a project in Bristol village hotel. The brief from the client was – “We want to section off parts of the gym via lighting so that we can carry out classes live on the gym floor”.
SSL carried out some research and came up with a design of a full lighting frame. Essentially this would be a steel supporting structure that was covered in a diffused plastic. The diffused plastic would disperse the LED tape which was stuck to each side of the steel supporting structure. This is was all controlled by a simple lighting controller mounted on the wall which gave the user 8 different settings.