INSTALLATION OVERVIEW
LES MILLS IMMERSIVE STUDIO
We have worked with the Village hotel group for some time now and have updated a lot of their studios nationwide. After meeting with the director’s, we put forward a proposal to install a Les Mills “The Trip”, immersive studio. SSL were awarded the contract and we began putting together a timeline of installation.
Les Mills define the trip as:
THE TRIP is a fully immersive workout experience. As a result, Les Mills combine a 40-minute multi-peak cycling workout with a journey through digitally created worlds. So with its cinema-scale screen and sound system, this IMMERSIVE STUDIO takes motivation and energy output to the next level.
“The Trip” has equipment specified by a German company. Therefore, SSL had to liaise with this company to ensure that the equipment was installed correctly and in line with their drawings and specification. Once all the immersive equipment was installed, the German company flew over to commission the project. Essentially, this involved merging the two Panasonic projectors to produce one single image and processing the sound system. It was then the responsibility of SSL to programme the lighting to work alongside the Les Mills trip.
KIT LIST
SSL installed a full martin audio sound system consisting of:
4no. CDD 10 Loudspeaker Cabinets.
4no. CDD 5 Loudspeaker Cabinets.
2no SX212 Subwoofers.
1no. Yamaha MTX3 processer.
Crown Amplification.
SSL installed a full Immersive Lighting system consisting of:
150 metres of LED tape.
Madrix drivers and control system.
Event spots located in random locations.
iPad control.
SSL installed a full video solution consisting of:
2no. Panasonic WUXGA laser projectors.
2no. Panasonic Zoom lens 0.8-1.1 upgrade kit.
Geometric manager pro software upgrade.
7 metre x 2 metre Curved projector screen.
SUMMARY
This project was challenging yet rewarding for SSL. However, the finished product really enhanced the total immersive feel of the studio with a full peripheral lighting design and surround sound system.